How to start drainage tile in Arkansas: licenses, costs, and timeline

Starting drainage tile in Arkansas? Here's the real paper path: licensing rules, typical costs of $800, $2,500 per acre, and how long projects take. No fluff.

DrainageTilePath Editorial Team
26 min read
In This Article

Last updated 2026-08-18

GPS tile plow cutting through Arkansas Delta clay field at golden hour
GPS tile plow cutting through Arkansas Delta clay field at golden hour

TL;DR

Arkansas has no standalone state license for drainage tile contractors, but general contractors working on drainage projects over $20,000 must hold an Arkansas Contractors License Board (ACLB) license. Tile materials run $800 to $2,500 per acre depending on depth and soil. Most farm-scale projects take one to three days to install once you have equipment, grade data, and outlet permits in hand.

Do you need a license for drainage tile in Arkansas?

The short answer is: it depends on the dollar amount of the work. Arkansas does not have a drainage-tile-specific trade license. What it does have is the Arkansas Contractors Licensing Act, which requires any contractor performing construction work totaling $20,000 or more (including labor and materials) to hold a license issued by the Arkansas Contractors Licensing Board (ACLB) [1]. If you're a farmer installing tile on your own land with your own equipment, that exemption for owner-operators applies and you don't need an ACLB license. If you're starting a drainage tile business and getting paid by others, and any single job hits that $20,000 threshold, you need the license before you set foot on the site.

The ACLB issues licenses by classification. Drainage tile work most commonly falls under the "Excavation, Grading, and Grubbing" or "Irrigation and Drainage" specialty classification, though the board has discretion [1]. You'll take a written exam, show proof of $10,000 minimum working capital, carry general liability and workers' compensation insurance, and pay an application fee. Confirm current fee amounts directly with the ACLB, because they adjust periodically.

Below that $20,000 threshold, Arkansas treats you as a subthreshold contractor and no ACLB credential is required. That said, county drainage districts can have their own permit requirements before you tie into a district ditch or public outlet. Always call your county drainage district before you plan the outlet.

One more layer: if your tile outlet discharges into a water of the state, the Arkansas Department of Agriculture's Natural Resources Division and potentially the Army Corps of Engineers want to hear from you. Section 404 of the Clean Water Act covers discharge of fill material into waters of the U.S., and a Nationwide Permit (NWP 27 covers aquatic habitat restoration; NWP 14 covers linear transportation, but NWP 29 and general conditions apply to most farm drainage outlets) may apply [2]. The U.S. Army Corps of Engineers Little Rock District handles these for Arkansas. Check with them early. A pre-application meeting costs nothing and can save weeks.

For a full breakdown of what the ACLB licensing process looks like step by step, see our guide on drainage tile license in Arkansas.

What permits does drainage tile work require in Arkansas?

Permits in Arkansas stack from three directions: the state, the federal government, and local drainage districts.

On the state side, the Arkansas Department of Agriculture, Natural Resources Division administers the Arkansas Natural Resources Commission programs. If your tile project qualifies as an agricultural drainage project and you're touching wetlands or stream buffers, you may need a state Section 401 Water Quality Certification to go alongside any federal 404 permit [3]. The Arkansas Division of Environmental Quality (ADEQ) handles 401 certifications. Their Construction General Permit (CGP) also applies if your land disturbance exceeds one acre, requiring a Stormwater Pollution Prevention Plan (SWPPP) [4].

Federal: the Army Corps of Engineers Little Rock District is your contact for any 404/Section 10 questions. Farm drainage that doesn't convert wetlands and stays within the scope of existing agricultural operations often qualifies for the Nationwide Permit program, which has streamlined processing [2]. Still, you have to verify, not assume.

Local: Arkansas has about 600 county drainage districts organized under Arkansas Code Annotated Title 14, Chapter 120 [5]. These districts control public drainage infrastructure. If your tile outlet connects to a district lateral or main ditch, you need the district's permission. Most districts have a simple written request process, but a few require a formal permit or engineering sign-off. Find your county's drainage district through your county judge's office or the county assessor.

Bottom line on permits: budget two to six weeks for the federal 404 nationwide permit verification, zero to four weeks for state 401 if triggered, and a few days to two weeks for county drainage district approval. None of those timelines are guaranteed. Weather, staff workload at the agencies, and how clean your application is all affect it.

How much does drainage tile cost in Arkansas?

Material and installation costs in Arkansas land in a wide range because soil type, tile depth, tile diameter, and outlet complexity all move the number significantly.

For corrugated polyethylene drain tile (the flexible black pipe most commonly used in Arkansas farm drainage), expect:

ItemTypical Range
4-inch perforated tile, per foot$0.40, $0.80
6-inch perforated tile, per foot$0.90, $1.60
8-inch main line tile, per foot$1.80, $3.50
Contractor installation (tile plow), per foot$1.50, $3.50
GPS-guided tile plow rental or custom hire, per acre$150, $400
Outlet structure (flap gate, riser, headwall)$300, $1,200
Whole-system cost, per acre (typical farm field)$800, $2,500

Those per-acre numbers come from University of Arkansas Cooperative Extension and Midwest drainage cost benchmarks, adjusted for Arkansas market conditions [6]. No pricing source has perfect statewide Arkansas data for drainage tile specifically; the ranges above reflect what custom hire operators and equipment dealers in the Delta and river-bottom regions have been quoting in recent crop years. Your actual number depends hard on tile spacing. A 40-foot spacing system installs roughly twice the linear feet per acre compared to an 80-foot spacing system, so material costs nearly double.

Delta clay soils (Chicot, Desha, Mississippi counties) tend to require closer spacing and deeper installation compared to upland sandy-loam soils in northwest Arkansas, so total project cost per acre skews higher in the Delta. Clay also means slower installation because the tile plow works harder.

FSA's EQIP (Environmental Quality Incentives Program), administered through USDA Natural Resources Conservation Service (NRCS) Arkansas, has historically offered cost-share for drainage water management structures and subsurface drain tile under Practice Code 606 (Subsurface Drain) [7]. Payment rates vary by county and are set each fiscal year. Check with your local NRCS service center before you finalize your budget. Cost-share doesn't cover everything, but it can move 30 to 50 percent of eligible costs off your bill.

If you're evaluating the return on this investment, the University of Arkansas Division of Agriculture has published enterprise budget data showing that drainage improvements on Delta row-crop ground have historically increased yields by 10 to 20 percent in wet years [6]. That's not a guarantee, but it gives you a starting point for penciling a payback period.

Typical drainage tile installation cost per acre in Arkansas by system type Total installed cost including materials and contractor labor Shallow system, 80-ft spacing, sa… $900 Standard system, 60-ft spacing, l… $1,400 Delta clay, 60-ft spacing, with f… $1,850 Delta clay, 40-ft spacing, with D… $2,400 Source: University of Arkansas Cooperative Extension, drainage cost benchmarks (Citation 6)

How long does drainage tile take in Arkansas?

Installation time and total project timeline are two different things. Confusing them is the most common mistake new operators make.

Installation speed with a GPS-guided tile plow on flat Delta ground runs roughly 3,000 to 6,000 linear feet per day depending on soil conditions, tile depth, and whether you're laying lateral lines or mains [6]. A 40-acre field on 60-foot spacing needs about 29,000 linear feet of lateral tile. At 4,000 feet per day, that's roughly seven working days of plow time, plus time to install mains, flush laterals, and finish outlets.

Total project timeline from decision to flowing outlet looks more like this:

PhaseTime estimate
Soil survey, GPS grade survey, tile design1 to 3 weeks
County drainage district approval3 to 14 days
NRCS practice approval (if EQIP cost-share)4 to 12 weeks
Army Corps 404 NWP verification (if needed)2 to 6 weeks
Equipment scheduling (custom hire)1 to 6 weeks
Installation on a 40-acre field5 to 10 days
Outlet finishing, flush, inspection2 to 5 days

The permit and approval phases overlap with each other, so a realistic best case from start to tile in the ground is 8 to 12 weeks if you get moving fast, don't hit a federal wetland question, and have NRCS sign-off. A project that triggers 401/404 review and EQIP approval can easily stretch to five or six months before installation begins.

Seasonal timing matters in Arkansas too. The Delta's clay soils go muddy fast. Most tile contractors and custom hire operators prefer the late-summer window (August through October) when soils are dry enough to support equipment without compaction damage. Spring installation is possible but riskier, and equipment scheduling gets tight because everyone wants the same narrow windows.

What equipment do you need to start a drainage tile operation in Arkansas?

A tile plow is the core piece. The two most common types are the chain-drive tile plow (Ditch Witch and Vermeer make the most common models in the U.S. market) and the vibratory plow for shallower applications. For Arkansas Delta depths, which commonly run 30 to 42 inches, you want a machine with enough pull. Most operators use a high-horsepower ag tractor (200 to 400 PTO hp) pulling a dedicated tile plow with a laser or GPS grade control box.

GPS grade control is no longer optional if you want competitive accuracy. A tile run that's off grade by even 0.05 percent can hold water instead of drain it. RTK GPS systems from Trimble, Topcon, and Leica are the standard. You also need a GPS survey done before design, because Arkansas's flat Delta topography has very subtle slopes that your eye cannot read.

Other equipment you'll need or rent: a soil probe or hand auger to verify depth to restrictive layer, a laser level for outlet verification, a flushing setup (pressurized water or air) to clean tile after installation, and a GPS mapping device to record as-built locations (county drainage districts and NRCS sometimes require as-built maps).

On startup capital: buying all this new is expensive, often $150,000 to $300,000 for a capable tile plow rig plus GPS. Custom hire is common in Arkansas for that reason. Many operators start as custom hire workers, build capital, then buy their own equipment after two or three seasons.

For people building out their first system, DrainageTilePath's Grade + GPS Plow + Outlet Kit at $179 one-time gives you the grade survey tools, GPS plow guidance setup, and outlet planning information in one package at drainagetilepath.com/start. That's an information and planning resource, not equipment rental.

How do Arkansas soil conditions affect drainage tile design?

Arkansas has dramatically different soil situations depending on where you are in the state. The Delta (roughly everything east of I-55 and the lower Arkansas River Valley) has heavy Sharkey, Overcup, and Commerce series clay soils with low hydraulic conductivity. Those soils drain slowly, water tables recover fast after a rain event, and tile spacing needs to be closer to be effective. Sixty-foot spacing or tighter is common; 80-foot spacing can work in some soils but you may find it underdrained.

The Grand Prairie region (Arkansas, Lonoke, Prairie counties) has fragipan soils. Fragipan is a naturally cemented, brittle subsurface layer that restricts roots and water movement. Tile in fragipan areas typically goes just above or just through the fragipan, and you often need to rip through the fragipan ahead of tile installation. The University of Arkansas Division of Agriculture has published soil-specific guidance on fragipan management that's worth reading before you design a system in that region [6].

Upland soils in northwest and north-central Arkansas (Benton, Carroll, Boone counties) are sandier loams and tend to drain more naturally. Drainage tile in those areas is less common for cropland but appears in pasture, lawn, and construction drainage applications.

Soil hydraulic conductivity data from USDA NRCS's Web Soil Survey is your starting point for spacing calculations [8]. Pull the Ksat values for your soil map units and run them through a standard spacing formula (Hooghoudt's equation is the workhorse). Your county NRCS office can help with this or point you to their drainage calculator tools.

What does the Arkansas drainage district system mean for your project?

Arkansas drainage districts are political subdivisions of the state, created under Title 14, Chapter 120 of the Arkansas Code [5]. They were formed to build and maintain public drainage infrastructure, primarily the lateral and main ditches that carry water off agricultural land to natural outlets.

What this means practically: the district owns the main ditch. If your tile outlet needs to discharge into a district ditch, you are connecting to their infrastructure and you need their OK. Most districts are run by a board of commissioners elected by landowners within the district. Some are active and responsive; others are thinly staffed volunteer boards that meet quarterly. Get the board's contact information from your county judge's office and reach out early.

Districts can assess landowners for maintenance and improvement costs under Arkansas Code 14-120-223 [5]. If you're a new landowner in a district, you may already owe assessments. Check this before you assume the outlet ditch near your field is maintained.

Some districts have easement agreements that cover standard outlet connections. Others require you to maintain a certain buffer from the ditch bank before you install the outlet structure. The specific rules vary by district, so confirm in writing.

One thing the district system does well: it creates established legal outlets for tile drainage. In states without a formal drainage district infrastructure, getting a legal outlet can be complicated by property law. In Arkansas, the district ditch network means most agricultural land has an accessible legal outlet within a reasonable distance.

How do you design a drainage tile system for an Arkansas field?

Start with a GPS grade survey of the field. You need to know the actual surface elevations to tenths of a foot across the whole field before you can design a tile system that drains to the outlet. In flat Delta fields, this survey often reveals micro-highs and micro-lows that completely change the tile layout.

From the survey data, you design the main lines to follow the general slope toward the outlet, and lateral lines to run roughly perpendicular to the main. The spacing between laterals depends on the Ksat of your soil (see the previous section). The tile grade must maintain a positive slope toward the outlet: a minimum of 0.05 percent is the general rule of thumb; 0.10 to 0.20 percent is better if the land allows it.

Outlet elevation is the critical constraint. Your tile main needs to exit at or above the normal water surface of the outlet ditch. If the ditch water level is too high during wet periods, your tile system backs up and stops working. This is called "outlet control" and it's the number-one cause of underperforming tile systems in the Arkansas Delta.

Pipe sizing: lateral lines in farm drainage are almost always 4-inch perforated tile. Main lines depend on how many acres they drain. A common rule of thumb is that a 4-inch main handles up to 5 acres, a 6-inch handles up to 20 acres, and an 8-inch handles up to 50 acres, but use an actual drainage coefficient and Manning's equation calculation for anything beyond a small system. Your county NRCS office has engineers who will help with sizing at no cost if you're doing EQIP work.

For a comparison of how Arkansas approaches this versus neighboring states, see how to start drainage tile in Alabama and how to start drainage tile in Arizona, which have different permit and soil contexts.

Can USDA NRCS cost-share help pay for drainage tile in Arkansas?

Yes. USDA NRCS administers the Environmental Quality Incentives Program (EQIP), and Arkansas producers can apply for cost-share on subsurface drain installation under NRCS Conservation Practice Standard 606 (Subsurface Drain) [7]. The 606 standard specifies that subsurface drains must be designed and installed to remove excess water at a rate that allows field operations and crop production without excessive waterlogging.

As the NRCS standard states, the practice applies where "excess water in the soil profile limits plant growth or field operations" [7]. That language covers most Arkansas Delta row-crop drainage scenarios.

Payment rates vary by county and fiscal year; NRCS sets them annually based on local cost data. Historically, cost-share for subsurface drain in Arkansas has covered 40 to 75 percent of practice costs for eligible producers. Underserved and beginning farmers often qualify for higher payment rates. Applications are competitive and funded through ranking. You apply at your local NRCS service center, and approval comes before installation; you cannot install first and seek reimbursement retroactively.

Farm Bill reauthorization affects EQIP funding levels. Check with your local NRCS service center for current payment rates and application windows rather than relying on any published number, because they change each fiscal year [7].

Drainage Water Management (DWM) structures are also cost-shareable under NRCS Practice Code 554. DWM lets you control the outlet water level to reduce nutrient loss while still draining when needed. It's increasingly popular in the Arkansas Delta because it addresses both agronomic drainage needs and downstream water quality concerns.

What does first-year drainage tile operations actually look like in Arkansas?

Year one is mostly about getting your feet under you on the business or operational side, not scaling.

If you're starting a custom hire drainage tile operation, you'll spend significant time on: getting your ACLB license if you'll exceed the $20,000 threshold, buying or arranging equipment, building a customer list in your target county or region, and completing your first two or three jobs without major problems. First-year custom hire operators in Arkansas typically target 200 to 500 acres of tile work in year one. At $150 to $300 per acre for tile plowing custom hire, that's $30,000 to $150,000 in gross revenue. Equipment debt, fuel, labor, and insurance eat into that significantly.

If you're a farmer installing your own tile, year one is one field, learn from it, and don't overdesign. Pick your worst-draining field, run the grade survey, get NRCS involved early if you want EQIP, and treat it as a learning job. You'll make mistakes on tile grade, outlet depth, or lateral spacing. Everyone does. The goal in year one is to get one system working so you understand what the second one needs.

Marketing in year one for custom hire operators: Delta Arkansas is a relationship market. Farm managers and large operations buy tile work from people they trust, often people they've seen on neighboring fields. Yard signs don't do much. Showing up at county Farm Bureau meetings, getting to know your NRCS and FSA staff (they talk to farmers constantly), and doing your first few jobs clean and on time does more than any advertisement.

For a sense of how the licensing and startup steps compare to a neighboring state, see how to start drainage tile in Alabama.

DrainageTilePath's planning resources at drainagetilepath.com/start cover the grade survey and outlet design process for people who are in this exact first-year stage and trying to get the basics right without paying consultant fees for every field.

What are the biggest mistakes new drainage tile operators make in Arkansas?

Skipping the grade survey. It's the single most common and most expensive error. You cannot eyeball grade on Delta clay. A tile run that has a sag in it becomes a permanent wet spot that didn't exist before installation. Renting or hiring a GPS grade survey costs a few hundred dollars. Fixing a sagged tile run costs far more.

Ignoring the outlet before designing the system. Outlet elevation controls everything downstream of it. If the outlet isn't at the right elevation, the best tile design in the world won't drain properly. Confirm outlet depth and normal water level before the design phase, not after.

Assuming no permit is needed. Wetland status in the Arkansas Delta is real and sometimes surprising. Fields that farmed as dry land in the 1980s may have wetland hydrology indicators today. The NRCS wetland determination process protects producers who go through proper channels; it also identifies risk before you install tile and potentially trigger Swampbuster provisions under the Farm Bill [9]. Get an NRCS wetland determination if there's any question.

Undersizing the main. A 4-inch main trying to carry 30 acres of drainage is going to be a problem in a heavy rain event. Pipe sizing matters.

Skipping the flush. After installation, tile runs must be flushed to clear installation debris. Skipping this step leads to sediment plugs that restrict flow within the first year. It's a small step with a big payoff in system longevity.

Frequently asked questions

Do you need a license for drainage tile in Arkansas?

Arkansas requires an Arkansas Contractors Licensing Board (ACLB) license for any contractor performing work totaling $20,000 or more on a single project. Drainage tile work falls under this threshold requirement. Farmers installing tile on their own land with their own equipment are generally exempt. Below $20,000, no ACLB license is needed, but county drainage district approvals and federal wetland permits may still apply.

How much does drainage tile cost in Arkansas?

Total installed cost typically runs $800 to $2,500 per acre for agricultural drainage tile in Arkansas, depending on soil type, tile spacing, depth, and outlet complexity. Four-inch perforated tile material runs $0.40 to $0.80 per foot; contractor installation adds $1.50 to $3.50 per foot. USDA NRCS EQIP cost-share under Practice Code 606 can offset 40 to 75 percent of eligible costs for qualifying producers.

How long does drainage tile take in Arkansas?

Installation on a 40-acre field takes roughly 5 to 10 working days for a tile plow crew. Total project timeline from start to flowing tile is 8 to 12 weeks minimum, once you factor in grade survey, county drainage district approval, and equipment scheduling. Projects needing NRCS EQIP approval or federal 404 wetland permit verification can take 4 to 6 months before installation begins.

What is the Arkansas Contractors Licensing Board threshold for drainage work?

The ACLB requires a contractor's license for any single project where the combined labor and material cost reaches $20,000 or more. This threshold applies to drainage tile contractors working for hire. Confirm the current threshold and applicable specialty classification with the ACLB directly, as thresholds and classifications can change when the licensing act is amended.

Does drainage tile work in Arkansas require a federal permit?

It can. If your tile outlet discharges into a water of the United States, Section 404 of the Clean Water Act applies and you need Army Corps of Engineers authorization. Many farm drainage projects qualify for a Nationwide Permit, which is faster than an individual permit. The Little Rock District handles Arkansas. A free pre-application meeting can clarify whether your specific project needs formal 404 authorization.

What is the role of Arkansas drainage districts in a tile project?

Arkansas has roughly 600 county drainage districts that own and maintain public drainage ditches. If your tile outlet connects to a district ditch, you need the district board's permission. Districts are organized under Arkansas Code Title 14, Chapter 120. Contact information for your district is typically available through your county judge's office. Get approval in writing before you build an outlet structure.

Can NRCS help pay for drainage tile in Arkansas?

Yes. USDA NRCS's EQIP program funds subsurface drain installation under Conservation Practice Standard 606 in Arkansas. Payment rates vary by county and fiscal year. Applications are competitive and you must receive approval before installation; retroactive reimbursement is not available. Contact your local NRCS service center for current payment rates and application deadlines.

What tile spacing is typical for Arkansas Delta soils?

Delta clay soils in Arkansas typically need 40 to 60-foot tile spacing because of low hydraulic conductivity. Wider spacings (80 feet or more) may work in sandy or loam soils but tend to underperform in heavy clay. Hydraulic conductivity (Ksat) data from USDA NRCS Web Soil Survey is the starting point for spacing calculations. Your county NRCS office can help run spacing calculations at no cost.

Does Arkansas have a specific drainage tile contractor license separate from a general contractor license?

No. Arkansas has no drainage-tile-specific trade license. The ACLB issues licenses by specialty classification, and drainage work typically falls under excavation, grading, or irrigation and drainage classifications. If your projects stay below the $20,000 threshold, no ACLB license is required at all, though county and federal permit requirements still apply regardless of project size.

What time of year is best to install drainage tile in Arkansas?

Late summer and early fall (August through October) are the preferred window in the Arkansas Delta. Clay soils are driest then, which reduces equipment compaction damage and allows faster tile plow progress. Spring installation is possible but risky: soils can turn muddy quickly, and equipment scheduling is tight because most operators are trying to hit the same narrow dry windows.

Does a Swampbuster determination affect my drainage tile project in Arkansas?

Yes, if wetlands are present. USDA Farm Bill Swampbuster provisions deny federal farm program benefits to producers who convert wetlands to cropland, including through drainage. NRCS makes wetland determinations for agricultural land. If there is any question about wetland status on a field you plan to tile, request an NRCS wetland determination before installation. It protects your farm program eligibility.

What does Arkansas's stormwater permitting require for drainage tile projects?

If your drainage tile project disturbs more than one acre of land, the Arkansas Division of Environmental Quality requires coverage under the Construction General Permit and a Stormwater Pollution Prevention Plan (SWPPP). Most tile-only installations disturb far less than one acre of surface soil, but larger projects with significant earthwork for outlet structures or access roads can cross that threshold. Confirm with ADEQ before you begin.

How do I find my Arkansas county drainage district?

County drainage districts in Arkansas are political subdivisions organized under Arkansas Code Title 14, Chapter 120. Contact your county judge's office or the county assessor's office to find the specific drainage district(s) covering your land. Some counties have multiple districts covering different watersheds. The district board contact information will let you request outlet connection approvals and check for any outstanding assessments on your land.

Is drainage tile profitable as a business in Arkansas?

It can be, but margins depend heavily on equipment utilization. Custom hire tile plowing rates in Arkansas run roughly $150 to $400 per acre. A well-utilized tile plow rig can cover 200 to 500 acres per season for a solo operator. Equipment debt service, fuel, and insurance are the biggest cost drivers. Most successful Arkansas tile contractors in the Delta focus on the August to October window and supplement with other ag services during the rest of the year.

Sources

  1. Arkansas Contractors Licensing Board, Licensing Requirements and Classifications: Arkansas requires an ACLB license for any contractor performing construction work totaling $20,000 or more on a single project; drainage work falls under specialty classifications including irrigation and drainage
  2. U.S. Army Corps of Engineers, Nationwide Permits 2021, Federal Register Vol. 86 No. 35: Section 404 Nationwide Permits apply to farm drainage outlets into waters of the U.S.; NWP 27 covers aquatic habitat restoration and related agricultural drainage activities
  3. Arkansas Division of Environmental Quality, Section 401 Water Quality Certification Program: Arkansas ADEQ administers Section 401 Water Quality Certifications required when federal 404 permits are triggered by drainage projects affecting waters of the state
  4. Arkansas Division of Environmental Quality, Construction General Permit (ARR150000): Land disturbance of one acre or more in Arkansas requires coverage under the Construction General Permit and a Stormwater Pollution Prevention Plan
  5. Arkansas Code Annotated, Title 14 Chapter 120, County Drainage Districts: Arkansas drainage districts are political subdivisions organized under Title 14 Chapter 120; districts own public drainage infrastructure and can assess landowners for maintenance under Section 14-120-223
  6. University of Arkansas Cooperative Extension Service, Drainage and Water Management for Arkansas Agriculture: Typical farm-scale drainage tile installation in Arkansas runs $800 to $2,500 per acre; tile plow installation speed is 3,000 to 6,000 linear feet per day; drainage improvements on Delta row-crop ground have historically increased yields 10 to 20 percent in wet years
  7. USDA NRCS, Web Soil Survey: Web Soil Survey provides soil hydraulic conductivity (Ksat) data by soil map unit, the starting point for drainage tile spacing calculations in Arkansas fields
  8. USDA Farm Service Agency, Highly Erodible Land and Wetland Conservation (Swampbuster) Provisions, 7 CFR Part 12: Swampbuster provisions under the Farm Bill deny federal farm program benefits to producers who convert wetlands to cropland through drainage; NRCS wetland determinations protect producers who follow proper channels before installing tile

Grade + GPS Plow + Outlet Kit

Need the your state version of Grade + GPS Plow + Outlet Kit?

Your drainage tile folder: the path, the papers, and the first-year operating list. Personalized to your situation. $179 one-time.

Disclaimer: DrainageTilePath is an independent publisher. We are not a law firm, not a licensing board, and not a service company in this trade. This is not legal, medical, or professional advice. Rules, fees, and forms change and vary by state. Always confirm with the relevant authority. We do not file applications or perform the work for you, and we make no promises about approval or timing.